Accountability for Results
$421,000
Contract
25 Beds
Critical Access Hospital
Sept 2013
Completion
Project Description
Pulaski Memorial Hospital completed a multi-phase renovation to update their facility, including a renovation of their chilled water plant and surgical suites to remedy seasonal temperature and humidity issues. Performance Services was hired due to the owner's desire for an integrated design, construction, and controls expertise and willingness to accept accountability for system functionality and construction results.
![]()
"Performance Services took a great deal of time in getting these systems designed so that they meet the needs of our hospital and saves the maximum amount of energy. Performance Services didn't just tack into our existing systems. They reviewed the entire functioning of our facility and designed systems that would improve the overall function, not just fix an immediate problem."
Director of Plant Engineering and Safety
OBJECTIVES
- Patient safety and infection control
- Comfort of surgeons
- Chilled water plant/controls integral to the engineered design
- Equipment reliability and maintainability
- Energy efficiency
- Performance Guarantees