Buna Independent School District

Small School District Saves Big with Energy Efficiency Project

  • $2,316,824

    Contract Total
  • 4

    Buildings
  • April 2025

    Completion

The Challenge

Buna ISD faced significant challenges due to outdated infrastructure and equipment across its facilities. With one elementary school, a middle school, and a newly constructed high school, the district struggled with aging facilities, originally built in the mid-1900s. Key issues included a failing air handling unit at the middle school, a barely operational HVAC system in the gym, and high energy consumption from outdated lighting systems. These issues drove up energy costs and impacted the comfort and learning environment for students and staff. The district needed a partner to help modernize its facilities while preparing for future growth.

The Solution

Performance Services collaborated with the district to deliver a $2.3 million project, addressing the following:

  • LED Lighting Upgrades: Replaced outdated lighting with high-efficiency LED systems across all facilities, including the football field.
  • Transformer Replacement: Installed modern, energy-efficient transformers at the elementary school.
  • HVAC System Overhaul: Replaced the gym’s HVAC system with a reliable, high-performance unit.
  • Building Controls Modernization: Upgraded temperature and ventilation controls, including refrigeration systems, for better energy management.
  • Field House Enhancements: Renovated lighting and controls on both home and visitor sides of the football field to meet modern standards.

The Results

The project delivered substantial benefits to the district, including:

  • Reduced Energy Costs: LED lighting and efficient transformers significantly cut energy usage, especially at the elementary school and the field house.
  • Improved Comfort: The new HVAC system created a more comfortable and consistent environment in the gym.
  • Operational Efficiency: Modern controls simplified facility management and reduced maintenance demands.
  • Future-Ready Infrastructure: The upgrades addressed immediate needs while laying the groundwork for future expansion.

A Collaborative Approach

Performance Services worked closely with the district’s leadership to align the project with their goals. Through proactive communication and thorough planning, the team minimized disruptions and delivered the project on time and within budget.