Project Description
The energy savings work on the IUPUI campus was particularly challenging. The largest measure of this work required the HVAC upgrades to be completed for a five-level office/classroom building over the three-month summer session.
![]()
"Performance Services did an excellent job in communicating with all the entities of the University in order to keep the project on schedule while considering the challenging factors of working in occupied buildings. The project manager was able to maintain a very high level of confidence that submitted schedules would be maintained and delivered spectacularly.
Construction manager Indiana university
BUSINESS SPEA BUILDING EFFICIENCY IMPROVEMENTS
- 45.9 kW roof-mounted solar photovoltaic panel array; ballasted rack system
- Web interface for remote monitoring of system performance, output, and alarms
- Retrofit of air flow and pumping systems to variable flow
- Steam condensate heat recovery
- Low flow plumbing fixture upgrade
- New building steam and chiller water meters
MEDICAL RESEARCH AND LIBRARY BUILDING
- Lab air handling unit (AHU) with advanced heat recovery modifications
- Redesigned LAB AHU coils piping to reduce excessive pump energy
- Retrofit of air flow and pumping systems to variable flow
- Control system expansion to save energy and increase thermal comfort
- Low flow plumbing fixture upgrade