School District of Reedsburg
slideslideslideslide

Guaranteed Energy Savings with HVAC Upgrades

$1,803,487

Contract Total

$149,253

Annual Energy + Operational Savings

2019

Completion Date

Project Description

The School District of Reedsburg serves the communities of Reedsburg, Ironton, LaValle, Loganville, and Rock Spring, WI, with an enrollment of more than 2,800 students in seven schools, including five elementary schools, one middle school, and one high school. The District chose Performance Services to implement a guaranteed energy savings contract aimed at upgrading twenty-year-old HVAC equipment at both Reedsburg Area High School and Westside Elementary School. In addition to upgrading the HVAC systems, variable air volume boxes will be installed to provide better airflow and temperature control. Together these improvements will help the district save $149,253 annually in energy and operational costs and improve the learning environment.

Project Highlights

  • Remove nine boilers and install four larger condensing boilers
  • Replace two chillers with new air-cooled chillers
  • Replace and install new non-proprietary control system at the high school
  • Convert the chilled water building system to a variable flow system
  • Install variable air volume boxes to provide better air and temperature control

 